Shipping CNC Parts from China: Costs, Methods, and Timeline Guide 2026

Shipping CNC Parts from China: Complete Cost, Method & Timeline Guide 2026

Quick reference: Shipping a 5kg box of CNC parts from Dongguan to the US costs approximately $40–75 by air express (3–5 days), $15–30 by air freight (5–8 days), or $5–15 by sea freight (15–35 days). For orders over 100kg, sea freight is typically the most economical choice. Import duties on CNC machined parts are usually 0–5% depending on the HS code and destination country.

Shipping Method Comparison (China → USA, 2026)

MethodCost per kgTransit TimeBest ForMin Weight
Air Express (DHL/FedEx/UPS)$8–15/kg3–5 daysPrototypes, urgent orders, under 30kg0.5kg
Air Freight$3–6/kg5–8 days30–300kg, moderate urgency45kg (chargeable)
Sea Freight (LCL)$0.5–2/kg15–25 days (West Coast), 25–35 days (East Coast)Over 200kg, cost-sensitive1m³ or 500kg
Sea Freight (FCL 20ft)$2,500–4,000/container15–35 daysLarge production orders, full container~10,000kg
Rail Freight (China–Europe)$1.5–3/kg18–22 daysEU destinations, mid-weight, mid-urgency100kg
Rates are estimates for Dongguan origin to US West Coast. Actual rates vary by season, fuel surcharge, and volume. Air express rates drop significantly above 21kg and 45kg weight breaks.

Real Shipping Cost Examples (Dongguan → US, 2026)

OrderWeightAir ExpressAir FreightSea (LCL)
5 prototype brackets2kg$30–45N/A (under min)N/A (under min)
50 small aluminum parts15kg$120–180$80–120N/A (under min)
200 stainless shafts80kg$520–750$240–400$120–200
500 aluminum housings300kg$1,800–2,500$900–1,500$300–500
Full production batch2,000kgN/A$5,000–8,000$1,000–2,000
Dongguan to US West Coast. Includes fuel surcharge, security fee, and basic insurance. Excludes customs duties, brokerage, and destination handling.

Incoterms for CNC Part Buyers: FOB vs CIF vs DDP

IncotermWhat Supplier PaysWhat Buyer PaysBest For
FOB (Free On Board)Production, local transport, export clearanceInternational freight, insurance, import duties, destination deliveryBuyers with their own freight forwarder
CIF (Cost, Insurance, Freight)Production, freight to destination port, insuranceImport duties, customs clearance, destination deliveryBuyers who want predictable shipping cost
DDP (Delivered Duty Paid)Everything including import duties and destination deliveryNothing — door-to-door deliveryFirst-time buyers, small orders, simplest option

Customs: HS Codes and Duties for CNC Parts

Most CNC machined parts fall under HS Chapter 84 or 85 with 0–5% import duty to the US and EU. Common HS codes:

  • 8479.89 — Machinery parts (0–2.5% US duty)
  • 7616.99 — Aluminum articles (0–3% US duty)
  • 7326.90 — Steel articles (0–2.9% US duty)
  • 8108.90 — Titanium articles (0–5% US duty)

Always confirm the correct HS code with your freight forwarder. An incorrect code can cause customs delays of 1–2 weeks and potential penalties.

Shipping Timeline: End-to-End Example

Typical 100-part aluminum bracket order, FOB Dongguan → Chicago:

  1. Order placed → Quote confirmed: Day 0
  2. Material procurement: Day 1–3
  3. CNC machining: Day 3–18
  4. Inspection + packaging: Day 18–20
  5. Export clearance: Day 20–21
  6. Air freight to ORD: Day 21–28
  7. US customs clearance: Day 28–30
  8. Truck to Chicago: Day 30–32
  9. Total: ~32 days door-to-door by air freight

Sea freight would add 15–20 days (47–52 days total) but reduce shipping cost by 70–80%.

More Logistics & Sourcing Guides